The restoration of the railway line at Odisha's Balasore train crash site. As per the Railway Ministery, more than 1000 manpower along with heavy machinery which includes 7 Poclain Machines, 2 Accident Relief Trains, 3-4 Railway and Road Cranes are deployed to restore the railway line as earliest. More than 288 people are dead and 1100 injured in Odisha's Balarose train crash on Friday after two passenger trains and a Goods train collided and derailed from the track.